









MagHub Quad Max 16" Portable Screen Extender
True Quad-Screen Setup: Instantly adds 3 extra screens to your laptop for a massive 4-display workspace.
Triple 16" IPS Display: Enjoy panoramic viewing with sharp resolution and vivid colors.
M1/M2/M3/M4/M5 Optimized: Seamless plug-and-play performance for MacBook Pro and Windows laptops.
Upgraded Pro-Folding Hinge: Refined folding structure helps reduce hinge stress, improve stability, and pack flat for travel.
Maximum Efficiency: Stop switching windows. View charts, code, meetings, and media simultaneously.
- Screen Size: 3x 16 inches
- Panel Type: IPS (W-LED Backlight)
- Resolution: 1920 × 1200 (Full HD+ / 2.2K)
- Aspect Ratio: 16:10
- Maximum Brightness: 250 nits
- Contrast Ratio: 1000:1
- Color Gamut: 100% sRGB
- Refresh Rate: 60Hz
Visual Angle: 178° (H: 89° / V: 89°)
Rotation Angles: Left/Right Screens (0°- 360°), Top Screen (0°- 180°)
Auto-Sensing Mode: Yes (Top screen automatically rotates content when flipped down)
All technical specifications can be found at the bottom of the page
To power up your multi-screen workspace, a brief driver installation is required. This fast, secure process takes just a few minutes and ensures optimal performance and seamless integration across all extended displays.
Hardware & Power:
- Dual USB-C Ports: Connects seamlessly with just a single USB-C cable to your laptop.
- Power Delivery: Requires a 30W power adapter (included) to fully drive all screens for the MagHub Quad 16".
OS & Processor Compatibility:
- macOS: Full support across Intel processors, M1, M2, M3, M4, M5 series, and later.
- Windows: Fully compatible with Windows 10, 11, and above.
Access everything you need to optimize your workflow. Get detailed guidance on setup, daily operation, and maintenance for the MagHub Quad 16".
User Guides
Required Driver Setup
To fully activate your extended displays, please install the latest software before first-use:
- macOS: [Download Driver]
- Windows: [Download Driver]
Support & Policies
Customer Support
Have questions? The INVZI support team is ready to assist you. Contact us anytime, and we’ll respond promptly. Live chat is available weekdays, 9:00 AM to 5:00 PM PST.
Need help finding the right setup? Reach out to us via the email contact form on our website or chat directly with one of our support agents.
Shipping Information
We proudly ship INVZI products worldwide to over 100 countries. Enjoy free shipping on all orders over $39 during our current promotion.
Standard delivery typically takes 6-10 business days. We partner with trusted global carriers like DHL, FedEx, YunExpress,and UPS to ensure a secure, fully tracked delivery experience for your monitors and gear.
Track Your Order
Once your INVZI order is dispatched, you’ll receive a confirmation email containing your tracking number and a direct link. You can track your package directly on the courier's website. We’ll also notify you once your shipment is out for delivery.
(If you don’t see tracking details in your inbox, please double-check your spam folder.)
Returns & Refunds
For purchases made directly through the official INVZI website, we offer a 14-day return policy from the date of delivery. Accessories included in the box with your INVZI portable monitor are covered under this policy; however, accessories purchased separately are not eligible. If you purchased your INVZI gear through an authorized third-party retailer, please contact them directly for return instructions.
If you decide the product isn't the right fit, we will provide a full refund within 14 days, provided the item is unopened and is returned with all original packaging and components. Refunds are processed to the original payment method.
Warranty
Every INVZI product is backed by a comprehensive one-year warranty covering any manufacturing defects. If you experience any issues within this period, simply reach out to our customer support team, and we’ll gladly assist you with a repair or replacement.

Every Screen Has a Purpose.
MagHub Quad 16 organizes your workspace into layers — main work in the center, references on the sides, and live context above.
Live Context
Keep meetings, dashboards, AI tools, or timelines visible above your main task.
Reference Space
Place documents, research, chat, or notes beside your main workspace.
Main Work
Stay focused on writing, coding, designing, editing, or your core task.
Preview & Tools
Keep browser tabs, analytics, files, or previews within easy reach.
Live Context
Keep meetings, dashboards, AI tools, or timelines visible above your main task.
Reference Space
Place documents, research, chat, or notes beside your main workspace.
Main Work
Stay focused on writing, coding, designing, editing, or your core task.
Preview & Tools
Keep browser tabs, analytics, files, or previews within easy reach.

Desktop Power. Backpack Ready.
Engineered to carry a full quad-screen workstation wherever you work. At just 5.28 lbs with a fold-flat design, MagHub Quad 16 gives you a serious multi-screen setup for the office, hotel, studio, trading desk, or client site.

Your Mobile Command Center.
Built for traders, creators, developers, and remote teams who need more context on screen. Keep live data, timelines, code, meetings, references, and tools visible at once — without constantly switching tabs.

See More. Work Better.
Three 16-inch 16:10 displays give you more vertical room for documents, dashboards, timelines, and creative tools. With 1920×1200 resolution, IPS panels, wide viewing angles, and 100% sRGB coverage, every screen is built for focused work.

Clean Connection. Stable Power.
Connect the displays to your laptop through USB-C while the included 30W power adapter keeps the extended screens running reliably. Fewer cables, cleaner desk, and a setup that is easier to deploy wherever you work.

Ready for Mac and Windows.
Compatible with macOS and Windows laptops, including Apple Silicon M-series MacBooks and Windows 10/11 devices. Supports 12"–18.5" laptops and requires a quick driver installation to unlock the full quad-screen experience.
Desktop Power. Backpack Ready.
Engineered to carry a full quad-screen workstation wherever you work. At just 5.28 lbs with a fold-flat design, MagHub Quad 16 gives you a serious multi-screen setup for the office, hotel, studio, trading desk, or client site.
Your Mobile Command Center.
Built for traders, creators, developers, and remote teams who need more context on screen. Keep live data, timelines, code, meetings, references, and tools visible at once — without constantly switching tabs.
See More. Work Better.
Three 16-inch 16:10 displays give you more vertical room for documents, dashboards, timelines, and creative tools. With 1920×1200 resolution, IPS panels, wide viewing angles, and 100% sRGB coverage, every screen is built for focused work.
Clean Connection. Stable Power.
Connect the displays to your laptop through USB-C while the included 30W power adapter keeps the extended screens running reliably. Fewer cables, cleaner desk, and a setup that is easier to deploy wherever you work.
Ready for Mac and Windows.
Compatible with macOS and Windows laptops, including Apple Silicon M-series MacBooks and Windows 10/11 devices. Supports 12"–18.5" laptops and requires a quick driver installation to unlock the full quad-screen experience.





Set Up in Minutes. Start Working Anywhere.
- Extend the stand
- Unfold the screens
- Connect the 30W power adapter
- Plug into your laptop via USB-C
- Install the driver and start working
Designed for Real Workflows
Integrated Adjustable Stand
Open the built-in stand and create a stable quad-screen setup on almost any desk.
Independent Screen Adjustment
Adjust the side and top screens to match your viewing angle, workflow, or collaboration needs.
Fold-Flat Portability
Fold the full setup flat and carry it between home, office, hotel, and client site.
USB-C Connection
Connect to your laptop through USB-C for a cleaner desk and faster setup.
Brilliant visuals with **unmatched** adaptability.
Advanced Display Technology
Experience crisp detail, vibrant color, and flexible viewing across three 16-inch IPS displays built for serious multitasking.
One Hub. All Systems. Total Compatibility.
macOS
Works seamlessly with MacBook Air, MacBook Pro, and modern Apple Silicon or Intel Mac devices.
Windows
Fully compatible with mainstream Windows laptops for flexible multi-screen productivity.
Mac mini / Compact Desktop
A clean match for compact desk setups, mini PCs, and modern desktop workflows.
Seamless Connectivity
Connect your laptop with USB-C or USB-A, then power the extended displays with the included adapter for a stable quad-screen setup.
Designed for Every Workflow.
Built for Private Work and Shared Moments.
Work focused when it's yours. Flip the display when it's time to present.
Everything You Need, Included.
MagHub Quad 16 ships with the essential cables, power adapter, USB driver, quick guide, user manual, and a portable carry bag — so you can set up faster without hunting for extra accessories.
MagHub Quad 16
Portable Bag
30W PD Charger
USB-A to USB-C Cable (Video & Power) 120cm
USB-C to USB-C Cable (Power Only)120cm
USB-C to USB-C Cable (Video & Power) 60cm
USB Driver
Quick Guide
User Manual
PRODUCT DETAILS
Closer Up.
Technical Specifications
Highlights
Quad-screen workstation: laptop display + 3 extended screens
Three 16-inch Full HD+ displays
16:10 aspect ratio with 1920 × 1200 resolution
178° viewing angle
Independent brightness control for each screen
Product Information
- Product: MagHub Quad 16
- Type: Portable laptop screen extender
- Laptop fit: 12"–18.5" laptops
- Folded size: 15.5 × 10.3 × 1.6 in
- Weight: 5.28 lbs
- Material: ABS composite body with aluminum alloy kickstand
Display
- Screen size: 3 × 16-inch displays
- Resolution: 1920 × 1200
- Aspect ratio: 16:10
- Panel type: IPS
- Color gamut: 100% sRGB
- Refresh rate: 60Hz
Connectivity & Power
- Laptop connection: USB-C or USB 3.0
- Power adapter: 30W PD charger included
- External power required for full multi-screen operation
- Pass-through charging supported with compatible laptop charger
- Driver required for setup
Compatible Operating System
- MacOS: Compatible with macOS 2019 or later
- Apple Silicon: Full support for M1, M2, M3, M4 chips
- Windows: Windows 10 and Windows 11 compatible
- Driver installation: Required for setup
- Included: User guide and driver files
Controls & OSD Menu
- Physical control buttons for easy operation
- Independent brightness adjustment for each screen
- Contrast and color settings
- Screen orientation support
- No built-in speakers

Trusted by Real Users in Real Workspaces.
Questions Before You Buy?
Here are the essentials about compatibility, setup, power, and what's included.



